don't read the menu options and go directly to the page content 
Welcome to my new website

Many of us over 60 are counted out when part-time jobs come up despite our collective wisdom and abilities.

To counter some of this prejudice I have dispensed with sending my CV and have instead created The Complete Picture, an animated ninety second overview of my life to date @ https://vimeo.com/223960456.

 

 

 

HS2 Railway project back to front

You are here: Home / Blog / Politics / HS2 Railway project back to front
11
Jan
The HS2 rail link announced yesterday which is likely to be built not by 2026 but frankly much later. Without Government pump priming and tax support for construction companies it is virtually a non-starter.

The original idea by Ove Arup was to create a hub at Heathrow and then link into Crosssrail which is due to be completed in 2015-ish.

If the notion of HS2 is to help the economies of the major Midland and Northern cities like Birmingham, Leeds and Manchester then build those links first. Otherwise they'll never be started let alone finished.

The idea of rebuilding Euston is frankly a non starter anyway. The hub at Heathrow was much more credible and much cheaper.  


Comments

There are currently no comments.



Add your comments



RadEditor - HTML WYSIWYG Editor. MS Word-like content editing experience thanks to a rich set of formatting tools, dropdowns, dialogs, system modules and built-in spell-check.
RadEditor's components - toolbar, content area, modes and modules
   
Toolbar's wrapper  
Content area wrapper
RadEditor's bottom area: Design, Html and Preview modes, Statistics module and resize handle.
It contains RadEditor's Modes/views (HTML, Design and Preview), Statistics and Resizer
Editor Mode buttonsStatistics moduleEditor resizer
 
 
RadEditor's Modules - special tools used to provide extra information such as Tag Inspector, Real Time HTML Viewer, Tag Properties and other.
   

website by Hudson Berkley Reinhart Ltd